Cart Total Items (0)

Cart

Project
image
image
image

Project Overview

The Adarsh Nagar Independent House in Kamta, Lucknow is a residential development focused on delivering a reliable and well planned home within a defined budget range. Wilman Infra Projects Pvt. Ltd. handled the complete construction lifecycle, ensuring consistent execution from foundation to finishing.

The project emphasizes functional design, efficient use of space, and long term durability. Each element was planned to support everyday residential needs while maintaining construction quality and cost control. The result is a well balanced independent house that offers both practicality and structural stability for family living.

Client:

Rajendra Sharma

Location:

Lucknow, Uttar Pradesh

Project Year:

2022-2023

Duration:

1Year

Price:

1 cr

Scope of Work

  • Complete construction of an independent residential house from foundation to finishing
  • Execution of RCC structural system including footing, columns, beams, slabs, and staircase
  • Brick masonry work with internal plastering and standard external finishing
  • Development of residential layout including living areas, bedrooms, kitchen, and utility spaces
  • Installation of flooring, wall finishes, and door and window systems
  • Integration of plumbing, drainage, and sanitation infrastructure
  • Electrical conduit placement and wiring coordination
  • External works including boundary wall, site leveling, and finishing

Construction Phases

Phase 1 – Substructure
The project began with excavation, PCC work, and RCC footing construction followed by plinth beam development and filling works.

Phase 2 – Superstructure
Column casting, beam placement, slab concreting, and staircase construction were carried out to form the structural framework.

Phase 3 – Envelope and External Finishing
Masonry and plastering works were completed, followed by external finishing to achieve durability and visual consistency.

Phase 4 – Interior and MEP
Internal finishing works including flooring, plumbing systems, and electrical conduit integration were executed.

Phase 5 – External Development
Final site finishing, boundary construction, and access preparation were completed prior to handover.

0+

Projects Delivered

0+

Satisfied Clients

0%

On-Time Completion Rate

0+

Years of Construction Expertise

What was the main objective of this independent house project?

The objective was to deliver a durable and functional home within a controlled budget range.

Yes, the entire project was executed from foundation to finishing including all service integrations.

Through efficient planning, optimized material usage, and simplified construction processes.

Yes, plumbing, drainage, sanitation, and electrical systems were fully integrated.

The project was completed within the 2022 to 2023 period.

Yes, the construction model can be adapted based on client requirements and site conditions.

Related Project

Price:

1.5 cr

Client:

Mahesh Ji

Project Year:

2026

Duration:

Ongoing

Saketpuri Residential Project (Ongoing)

Project Home Project Overview

Price:

3 cr

Client:

The villas

Project Year:

2024

Duration:

Ongoing

Banveerpur Villa Development (Ongoing)

Project Home Project Overview

Price:

40 lac

Client:

Praveen Kannoujia

Project Year:

2023-2024

Duration:

1Y

Kakori Mod Budget Housing Project

Project Home Project Overview

Price:

1.2 cr

Client:

Amar Singh

Project Year:

2021-2023

Duration:

2Y

Para Modern Residence

Project Home Project Overview

Price:

1.10 cr

Client:

Rajeev Shrivastava

Project Year:

2022-2023

Duration:

1Y

Aliganj Residential Build

Project Home Project Overview

Price:

90lac

Client:

Dr. Amar Sharma

Project Year:

2018-2019

Duration:

1Y

Deva Road Smart Home Project

Project Home Project Overview

Price:

3 cr

Client:

Abp Upadhay ji

Project Year:

2019-2020

Duration:

1Y

Taramandal Premium Residence

Project Home Project Overview