Cart Total Items (0)

Cart

Project
image

Project Overview

The Saketpuri Residential Project is an ongoing housing development aimed at delivering a well planned and structurally reliable residential unit. Wilman Infra Projects Pvt. Ltd. is overseeing the execution, ensuring that each stage of construction progresses in a controlled and systematic manner.

The project is being developed with a focus on efficient layout planning, proper structural execution, and seamless integration of essential services. Even at its current stage, the construction approach reflects a commitment to quality, planning discipline, and timely progress. Upon completion, the residence is expected to provide a durable and functional living environment aligned with modern residential needs.

Client:

Mahesh ji

Location:

Saketpuri, Ayodhya, Uttar Pradesh

Project Year:

2026

Duration:

Ongoing

Price:

1.5 cr

Scope of Work

  • Complete residential construction from foundation to finishing
  • Execution of RCC structural framework including footing, columns, beams, slabs, and staircase
  • Masonry work with internal plastering and standard external finishing
  • Development of residential layout including living spaces, bedrooms, kitchen, and utilities
  • Installation of flooring systems, wall finishes, and door and window units
  • Integration of plumbing systems, drainage networks, and sanitation infrastructure
  • Electrical conduit planning and wiring coordination
  • External development including site finishing and access works

Construction Phases

Phase 1 – Substructure
The project has initiated with site preparation, excavation, PCC work, and RCC foundation construction along with plinth beam development.

Phase 2 – Superstructure
Structural framework development including column casting, beam placement, and slab construction is currently in progress.

Phase 3 – Envelope and External Finishing
Masonry and external finishing works are planned to follow completion of the structural stage.

Phase 4 – Interior and MEP
Interior finishing, plumbing systems, and electrical conduit integration will be carried out in subsequent phases.

Phase 5 – External Development
Final site development, access work, and finishing will be completed prior to project handover.

0+

Projects Delivered

0+

Satisfied Clients

0%

On-Time Completion Rate

0+

Years of Construction Expertise

What is the current stage of the Saketpuri Residential Project?

The project is currently in the structural development phase with ongoing construction activities.

Yes, the project includes all stages from foundation to finishing along with service integration.

It is an independent residential unit designed for modern living requirements.

Yes, plumbing, drainage, sanitation, and electrical systems will be fully integrated.

A structurally sound, functional, and well planned residential unit suitable for long term use.

The external works formed a significant part of the project scope. Wilman Infra executed the approach driveway and forecourt paving, compound boundary wall, landscape planter beds with kerbing, entrance canopy structure, and general site drainage. The finished campus presents a clean, welcoming frontage with circular approach roads, ornamental planters, and an open assembly area — all of which were delivered as part of the same contract and contribute to the overall campus experience.

Related Project

Price:

3 cr

Client:

The villas

Project Year:

2024

Duration:

Ongoing

Banveerpur Villa Development (Ongoing)

Project Home Project Overview

Price:

40 lac

Client:

Praveen Kannoujia

Project Year:

2023-2024

Duration:

1Y

Kakori Mod Budget Housing Project

Project Home Project Overview

Price:

1.2 cr

Client:

Amar Singh

Project Year:

2021-2023

Duration:

2Y

Para Modern Residence

Project Home Project Overview

Price:

1 cr

Client:

Rajendra Sharma

Project Year:

2022-2023

Duration:

1Y

Adarsh Nagar Independent House

Project Home Project Overview

Price:

1.10 cr

Client:

Rajeev Shrivastava

Project Year:

2022-2023

Duration:

1Y

Aliganj Residential Build

Project Home Project Overview

Price:

90lac

Client:

Dr. Amar Sharma

Project Year:

2018-2019

Duration:

1Y

Deva Road Smart Home Project

Project Home Project Overview

Price:

3 cr

Client:

Abp Upadhay ji

Project Year:

2019-2020

Duration:

1Y

Taramandal Premium Residence

Project Home Project Overview