Cart Total Items (0)

Cart







Category:

1service

Concrete mix design is reviewed against the structural specification before ordering. Delivery dockets are checked on arrival. Cube samples are taken for every pour and sent for third-party testing at 7 and 28 days. Results are tracked against the specified characteristic strength and any non-conformances are addressed before the element is loaded.

Leave a Reply

Your email address will not be published. Required fields are marked *